Zachry-ACS Proposal for I-69/TTC
Print This Page «
Send to a friend
In March 2008, Zachry American Infrastructure, Inc. and ACS Infrastructure Development, Inc. submitted a detailed proposal for developing I-69. This document may be viewed and/or downloaded using the links below. Please click on document title to see a document description.
Download Here
01 Executive Summary
Brief description of the I-69 TTC Project proposal and the Conceptual Development Plan for this project
06/26/2008
File Size: 0KB
Download Here
02 Instructions to Proposers
I69/TTC Project Proposer Information Certifications and Documents including Proposal letter, Proposer Information, Industrial Safety Record, Surety Letter, Financial Responsibility Letter, Conflict of Interest Disclosure and Equal Opportunity Certification among other documents.
06/26/2008
File Size: 0KB
Download Here
03 Conceptual Development
Document contains development plans that include a Conceptual Development Plan, US 77 Facility Conceptual Plan, US 77 Mentoring Plan, Project Management Plan and Quality Management Plan.
06/26/2008
File Size: 0KB
Download Here
04 Appendices
Document contains appendices to the Conceptual Development Plan, US 77 Facility Conceptual Plan, US 77 Mentoring Plan, Project Management Plan and Quality Management Plan.
06/26/2008
File Size: 0KB
Download Here
05 Map - Detail area of US 77
US 77 System Map Figure E-1 ZAI/ACS proposal map.
06/26/2008
File Size: 0KB
Download Here
06 Map - Border to Border
I-69 Map Figure E-2 ZAI/ACS proposal map.
06/26/2008
File Size: 0KB
Download Here
07 Conceptual Financial Plan
I69/TTC Conceptual Financial Plans for the Conceptual Development Plan, US 77 Facility Conceptual Plan, US 77 Mentoring Plan, Project Management Plan and Quality Management Plan.
06/26/2008
File Size: 0KB
Download Here
08 Form K Price Proposal
Form used by proposer to price proposal for the initial scope of work and provide payment methodology that includes a proposed price for each service or deliverable with specific milestones.
06/26/2008
File Size: 0KB
Download Here
09 Exhibit 1
Tables, charts and graphs that describe the I69 TTC Design, Build (DB) and Operation & Maintenance (O&M) Cost for the CFP Near Term Facilities. CAPEX, OPEX; US 77 DB Cost, US77 O&M Cost, I69 TTC CFP Mid Term Facilities DB Cost, Mid Term. Capex, O&M Cost and CFP ROW Cost and Schedule.
06/26/2008
File Size: 0KB
Download Here
10 Exhibit 2
Tables, charts and graphs that describe the I69 TTC Preliminary Traffic and Revenue Forecasts of the CFP, Near Term, I69 Corridor ADT Evolution (Near Term Projects), US59 Reliever Route Optimal Toll Table, US59 South/Loop 224 Optimal Toll Table.
06/26/2008
File Size: 0KB
Download Here
11 Exhibit 3
Project Ranger: US 77 System Key Financial Model Assumptions.
06/26/2008
File Size: 0KB
Download Here
12 Exhibit 4
Tables that describe the I69/TTC – US-77 System Summary Sheet, Cash flow Statement, Book Profit and Loss and Balance Sheet.
06/26/2008
File Size: 0KB
Download Here
13 Presentation to the Texas Transportation Commission
Slide presentation of the I-69 Public Private Partnership Comprehensive Development Agreement.
Presentation files presented to the Texas Transportation Commission on June 26, 2008
06/26/2008
File Size: 0KB